Skip to main content
Intel EPM1270GT144C4 — FPGA / CPLD & Programmable Logic

Altera EPM1270GT144C4 MAX II CPLD, 980 macrocells, 6.2 ns

MPNEPM1270GT144C4
Active

Altera MAX® II CPLD, EPM1270GT144C4, 980 macrocells, 116 I/O, 6.2 ns pin-to-pin delay, 1.71V–1.89V core, 144-LQFP, 0°C to 85°C, in-system programmable.

$156.0000Ref. price · indicative, final on quote
Sourced new & surplus through independent channelsAuthenticity-screened · ESD-safe packingListing updated Aug 2026

Specifications

EPM1270GT144C4 specifications
ParameterValue
SeriesMAX® II
MountingSurface Mount
Programmable typeIn System Programmable
Voltage supply - internal1.71V ~ 1.89V
Operating temperature0°C~85°C(TJ)
PackageTray
Number of i (O)116
Case144-LQFP
Number of macrocells980
Delay time tpd(1) max6.2 ns
Number of logic elements (Blocks)1270

Product details

980 macrocells — what that logic budget buys

With 980 macrocells and 1270 logic elements, this part can absorb a medium-complexity glue-logic design. The 116 I/O provide room for most board-level control signals without a second CPLD.

Lifecycle reality — EOL-hot means act now

The EPM1270GT144C4 has an active product status with an EOL-hot lifecycle stage. The part is still orderable, but the end-of-life process has begun.

Frequently asked questions

Is EPM1270GT144C4 obsolete or end-of-life?

The EPM1270GT144C4 is still active in the product status but flagged as EOL-hot, meaning the end-of-life process has begun. Orders are still accepted, but the last-time-buy window is open — secure your lifetime requirement now.

What is the exact operating voltage of EPM1270GT144C4 and can it work with 3.3V?

The core supply (VCCINT) must be between 1.71 V and 1.89 V — a 1.8 V nominal rail. The I/O banks can operate at 3.3 V, but the core cannot. A separate 1.8 V regulator is required on the board.

Does EPM1270GT144C4 require external configuration memory?

No. The MAX II family uses on-chip flash for configuration storage, so there is no external serial EEPROM or configuration device needed on the BOM.

What is the lead time for ordering EPM1270GT144C4?

Lead time is confirmed at quote time against an RFQ. Given the EOL-hot status, lead times may be shorter than normal as distributors clear inventory — but act promptly before the last-time-buy window closes.