Skip to main content
NXP Semiconductors PHE13009/DG,127 — Logic ICs

PHE13009/DG,127 NPN Power Transistor, 400 V, 12 A, TO-220-3

MPNPHE13009/DG,127
End of Life

Nexperia PHE13009/DG,127 NPN power bipolar transistor, 400 V Vceo, 12 A Ic, 80 W max, TO-220-3 through-hole package, active lifecycle.

$0.33Ref. price · indicative, final on quote
PackagingTO-220-3
Sourced new & surplus through independent channelsAuthenticity-screened · ESD-safe packingListing updated Aug 2026

Specifications

PHE13009/DG,127 specifications
ParameterValue
MountingThrough Hole
FET typeNPN
Voltage - collector emitter breakdown400 V
Current - collector (Ic)12 A
Current - collector cutoff100µA
DC current gain (hFE) (Min) @ ic, vce8 @ 5A, 5V
Power - max80 W
Operating temperature150°C (TJ)
PackageBulk
CaseTO-220-3
Vce saturation (Max) @ ib, ic2V @ 1.6A, 8A

Product details

400 V, 12 A NPN power transistor for offline converters

The PHE13009/DG,127 from Nexperia is an NPN power bipolar junction transistor rated for 400 V collector-emitter breakdown and 12 A continuous collector current, housed in a TO-220-3 through-hole package. It is designed for the primary-side switch in flyback converters, PFC stages, and other off-line switched-mode power supplies where a rugged, cost-effective bipolar device is preferred over a MOSFET. The 80 W maximum power dissipation sets the heatsink sizing for a typical 100–150 W converter stage.

Vce(sat) is specified at 2 V maximum with 1.6 A base current driving 8 A collector current.

Active lifecycle — no EOL watch needed

The TO-220-3 (supplier package TO-220AB) is a standard through-hole power package. The metal tab is the collector. For 80 W dissipation, a substantial heatsink is required — the tab-to-ambient thermal resistance of a TO-220 in still air is around 60–70 °C/W, so forced air or a large finned heatsink is assumed. The 100 µA maximum collector cutoff current at 150 °C junction gives a sanity check on leakage at high temperature.

Frequently asked questions

What is the lead time for PHE13009/DG,127?

Lead time is confirmed at quote time. Submit an RFQ for current lead time and pricing.