Skip to main content
Micron Technology MT25QU128ABB8ESF-0AUT — DC-DC Power Modules

MT25QU128ABB8ESF-0AUT - Micron Technology

MPNMT25QU128ABB8ESF-0AUT
End of Life

IC FLASH 128MBIT SPI 16SOP2

$5.37Ref. price · indicative, final on quote
Packaging16-SOIC (0.295", 7.50mm Width)
StockContact for availability
MOQ1 pcs
  • 100% new & originalTraceable channels only — no refurbs, no pulls, no remarked parts.
  • Date & lot codes on quoteStated per line before you commit; label photos on request.
  • MSL-compliant ESD packingMoisture-sealed bags with indicator cards; reels photo-verified.
  • PayPal buyer protectionPay by T/T, PayPal or Payoneer — card payments covered end to end.

Specifications

MT25QU128ABB8ESF-0AUT Technical Specifications
ParameterValue
SeriesAutomotive, AEC-Q100
Memory typeNon-Volatile
Mounting typeSurface Mount
Voltage1.7V ~ 2V
Frequency133 MHz
Memory interfaceSPI - Quad I/O
Operating temperature-40°C ~ 105°C (TA)
PackageBox
TechnologyFLASH - NOR
Memory size128Mbit
Memory formatFLASH
Case16-SOIC (0.295\", 7.50mm Width)
Memory organization16M x 8
Write cycle time - word, page8ms, 2.8ms

Frequently asked questions

Is MT25QU128ABB8ESF-0AUT an automotive-grade NOR flash?

Buyers need to know if it meets AEC-Q100 requirements for use in automotive applications.

What is the difference between MT25QU128ABB8ESF-0AUT and MT25QL128ABB8ESF-0AUT?

Engineers often confuse the voltage variants and need to select the correct part for their supply.

Is MT25QU128ABB8ESF-0AUT obsolete or still active with a replacement?

Lifecycle status affects long-term design viability; buyers need to know if they can source it reliably.

What is the operating voltage range for MT25QU128ABB8ESF-0AUT?

Designers must confirm supply compatibility; a mismatch can cause system failure.

Where can I buy MT25QU128ABB8ESF-0AUT in small quantities?

Prototyping and low-volume production require accessible distributors with no minimums.

What is the lead time for ordering MT25QU128ABB8ESF-0AUT in bulk?

Production planners need to schedule procurement ahead of time to avoid delays.