Active lifecycle — no LTB pressure yet
No last-time-buy or end-of-life notice has been issued. For BOM planning, this part is a safe selection for a multi-year production run, though the QDR-II family is mature — keep an eye on PCNs for package or wafer-fab transitions.
Drop-in compatibility with the Bulk-pack peer
CY7C1512KV18-250BZC shares the same footprint, timing, and supply range. The only difference is the shipping medium: Bulk vs Tray.
