Skip to main content
Texas Instruments MSP430F148IRTDT — Microcontrollers & Processors (MCU / MPU / DSP)

MSP430F148IRTDT - Texas Instruments

MPNMSP430F148IRTDT
Active
$11.4632Ref. price · indicative, final on quote
StockContact for availability
MOQ1 pcs
  • 100% new & originalTraceable channels only — no refurbs, no pulls, no remarked parts.
  • Date & lot codes on quoteStated per line before you commit; label photos on request.
  • MSL-compliant ESD packingMoisture-sealed bags with indicator cards; reels photo-verified.
  • PayPal buyer protectionPay by T/T, PayPal or Payoneer — card payments covered end to end.

Specifications

MSP430F148IRTDT Technical Specifications
ParameterValue
SeriesMSP430x1xx
Mounting typeSurface Mount
Oscillator typeInternal
Program memory typeFLASH
Voltage - supply (Vcc (Vdd))1.8V ~ 3.6V
Operating temperature-40°C~85°C(TA)
Speed8MHz
PackageTape & Reel (TR); Cut Tape (CT)
RAM size2K x 8
Core size16-Bit
PeripheralsPOR, PWM, WDT
ConnectivitySPI, UART/USART
Number of i (O)48
Core processorMSP430 CPU16
Case64-VFQFN Exposed Pad
Data convertersA/D 8x12b
Program memory size48KB (48K x 8 + 256B)

Frequently asked questions

What is the MSP430F148IRTDT datasheet and where can I download it?

Design engineers need the official datasheet to verify electrical characteristics, pinout, and timing for circuit validation.

Is MSP430F148IRTDT active or obsolete?

Sourcing buyers and brokers need lifecycle status to ensure long-term supply and avoid last-time buy scenarios.

Where can I buy MSP430F148IRTDT with immediate stock?

Transactional buyers need reliable distributors with real-time inventory to fulfill urgent BOM line needs.

What is the package and footprint of MSP430F148IRTDT?

Maintenance techs and layout engineers must confirm mechanical fit for replacement or PCB rework.

Can MSP430F148IRTDT replace MSP430F148IPM?

Comparison seekers need to know pin-to-pin compatibility and any firmware changes before substituting parts.

What is the current price and lead time for MSP430F148IRTDT?

Sourcing buyers require up-to-date pricing and delivery estimates to manage project costs and schedules.