Skip to main content
Texas Instruments LM3S828-EGZ50-C2T — Microcontrollers & Processors (MCU / MPU / DSP)

LM3S828-EGZ50-C2T: 50MHz Stellaris ARM Cortex-M3 MCU in 48-VFQFN

MPNLM3S828-EGZ50-C2T
End of Life

TI Stellaris LM3S828 series ARM Cortex-M3 MCU, order code LM3S828-EGZ50-C2T; 50MHz, 64KB Flash, 8KB RAM, 28 I/O, 3-3.6V supply, -40°C to 105°C operating temperature, 48-VFQFN exposed pad, Tape & Reel.

Independent supplier — new & surplus stockAuthenticity-screened · ESD-safe packingListing updated Aug 2026

Specifications

LM3S828-EGZ50-C2T specifications
ParameterValue
SeriesStellaris® ARM® Cortex®-M3S 800
MountingSurface Mount
Oscillator typeInternal
Program memory typeFLASH
Voltage - supply (Vcc (Vdd))3V ~ 3.6V
Operating temperature-40°C~105°C(TA)
Speed50MHz
PackageTape & Reel (TR)
RAM size8K x 8
Core size32-Bit Single-Core
PeripheralsBrown-out Detect/Reset, POR, PWM, WDT
ConnectivityI²C, Microwire, SPI, SSI, UART/USART
Number of i (O)28
Core processorARM® Cortex®-M3
Case48-VFQFN Exposed Pad
Data convertersA/D 8x10b
Program memory size64KB (64K x 8)

Frequently asked questions

Can I run my existing TI Tiva firmware on the LM3S828 without changes?

No. The LM3S828 Stellaris driverlib and peripheral register mapping diverge from the Tiva peripheral driver library — a recompile and firmware porting work is required, even though both are Cortex-M3 parts. Binary compatibility is not maintained across the Stellaris-to-Tiva transition.

Does the 8KB RAM fit a FreeRTOS application with a CANopen stack?

The 8KB RAM ceiling is tight. A FreeRTOS heap consuming ~6KB combined with a CANopen stack will approach the boundary under typical runtime conditions — memory budget analysis against the actual compiled binary is required before committing the line.

How do I source the LM3S828-EGZ50-C2T given the EOL-hot status?

Open an RFQ immediately to identify available channel stock and confirm lot traceability. The eol_hot window means allocation can close without advance notice — a documented last-time-buy quantity should be agreed with your supplier before the window resolves further.