For a BOM that needs to stay stable through a multi-year production run, this removes the obsolescence risk that haunts older FPGA families. The base product number EP4CE22 covers the full density and package variant set, so if a future spin needs more I/Os or a different package, the migration path stays within the same Cyclone IV E family.

Intel EP4CE22F17I7N Cyclone IV E FPGA, 22320 LEs, 153 I/O
Intel Cyclone® IV E FPGA, EP4CE22F17I7N, 22320 logic elements, 153 I/O, 608256 total RAM bits, 256-FBGA (17x17) package, -40°C to 100°C (TJ), 1.15V~1.25V supply, Active.
Specifications
| Parameter | Value |
|---|---|
| Series | Cyclone® IV E |
| Mounting | Surface Mount |
| Supply voltage | 1.15V ~ 1.25V |
| Operating temperature | -40°C~100°C(TJ) |
| Package | Tray |
| Number of i (O) | 153 |
| Case | 256-LBGA |
| Total RAM bits | 608256 |
| Number of LABs (CLBs) | 1395 |
| Number of logic elements (Cells) | 22320 |
Product details
Frequently asked questions
Where can I buy EP4CE22F17I7N?
EP4CE22F17I7N is available through independent distribution. Submit an RFQ for current pricing and availability — quotes are confirmed at order time with no minimum quantity commitment.
What is the price of EP4CE22F17I7N per unit?
Pricing depends on quantity, date-code spread, and packaging condition. Request a quote for a firm per-unit price on your target volume.
What are the specifications of EP4CE22F17I7N?
Key specs: 22,320 logic elements, 1,395 LABs/CLBs, 608,256 total RAM bits, 153 I/O, 256-FBGA (17x17) package, 1.15 V to 1.25 V supply, -40°C to 100°C (TJ) operating temperature range, Active lifecycle.
Is there a replacement for EP4CE22F17I7N?
Intel has not announced a direct replacement for this Active part. If you need a functionally similar FPGA, the Cyclone 10 LP 10CL025ZU256I8G offers 24,624 LEs in a similar 256-UBGA package, but verify the 1.0 V supply rail and I/O standard compatibility for your design.
What is the lead time for EP4CE22F17I7N?
Lead time is confirmed at quote time based on current factory and distributor inventory. For an Active part with no LTB pressure, typical lead times are manageable — request a quote for your required quantity.