Specs side by side

2 parts compared · 14 differing specs across 14 total parameters.

Quote all 2 parts
Specification differences for FGA25N120, IKW25N120H3
Parameter
Supply voltage-Same 1200V bus class; what changes is gate appetite - about 15V on with negative off bias in welder duty.
Memory & Peripherals-The generation difference to respect: the FGA is a planar NPT part tuned for soft resonant switching; the H3 is a hard-switching trench design with faster edges and a different gate resistor appetite.
CaseTO-3P (EIAJ SC-65) / TO-247TO-247
Compatibility Level-Pin-to-Pin (Minor Clock/Init Tuning)
Component CategoryIGBTs (Discrete)-
Core & Architecture-The modern Infineon generation: 1200V/25A with the co-packed fast diode, saturation voltage 2.4V max, a 175C junction rating and a 5 microsecond short-circuit window - the current-production answer where the FGA channel runs dry.
Firmware Notes-TO-3P and TO-247 are dimensionally and pin compatible (gate, collector, emitter, with the collector on the tab), so the swap physically fits - the gate resistor and di/dt behavior are what must be re-checked.
Hardware Notes-TO-247 body on a TO-3P land pattern: verify the clip and the 1200V creepage.
Lead Time Advantage-Shenzhen Spot Stock (24-48h Dispatch)
Market RealityThe 25N120 is the 1200V, 25A IGBT that anchors the power stage of welder inverters, induction heating boards and inverter supplies: a TO-3P body (the onsemi FGA25N120ANTD) or a TO-247 body (the Infineon IKW25N120), gate-collector-emitter in one shared order, a free-wheel diode co-packed, and a market full of mystery-grade 25N120 clones whose saturation voltage gives them away. The onsemi datasheet now carries a discontinued marking, which quietly moves this staple toward last-time-buy sourcing - and that is where verified, photographed stock becomes the difference between a repair and a comeback.-
Reference Part-FGA25N120
Role In CircuitOriginal Reference Part-
Sourcing Advantage-Current production; the mainstream repair-channel stock.
Sourcing StatusActive Shenzhen Spot Sourcing (24–48h)-

Parts