{"schemaVersion":"matrix-product-facts/v1","identity":{"mpn":"SCT4062KEC11","brand":"ROHM Semiconductor","brandSlug":"rohm","productSlug":"SCT4062KEC11","canonicalUrl":"https://icboms.com/rohm/SCT4062KEC11","factsUrl":"https://icboms.com/api/mcp/products/SCT4062KEC11","rawCanonicalId":null},"summary":{"shortDescription":"1200V, 62M, 3-PIN THD, TRENCH-ST","salesMarkdown":null,"metaTitle":null,"metaDescription":null,"metaKeywords":null},"attributes":{"series":null,"packageCase":null,"mountingType":null,"rohsStatus":"ROHS3 Compliant","productStatus":"Active","categoryPath":[],"specifications":{"Package":"Tube","FET Type":"N-Channel","Vgs (Max)":"+21V, -4V","Technology":"SiCFET (Silicon Carbide)","Mounting Type":"Through Hole","Package / Case":"TO-247-3","lifecycle_stage":"eol_hot","Vgs(th) (Max) @ Id":"4.8V @ 6.45mA","Operating Temperature":"175°C (TJ)","Rds On (Max) @ Id, Vgs":"81mOhm @ 12A, 18V","Power Dissipation (Max)":"115W","Supplier Device Package":"TO-247N","Gate Charge (Qg) (Max) @ Vgs":"64 nC @ 18 V","Drain to Source Voltage (Vdss)":"1200 V","Input Capacitance (Ciss) (Max) @ Vds":"1498 pF @ 800 V","Drive Voltage (Max Rds On, Min Rds On)":"18V","Current - Continuous Drain (Id) @ 25°C":"26A (Tc)"}},"commercial":{"minOrderQty":null,"leadTime":null,"referencePrice":"$12.57624","priceTiers":[{"qty":1,"price":"$12.57624","currency":"USD"},{"qty":10,"price":"$12.15348","currency":"USD"}]},"links":{"datasheetUrl":"https://cdn.icboms.com/309657b2f7f1944087c2dd7c34c308a2.pdf","sourceUrl":null,"alternativesUrl":"https://icboms.com/api/mcp/products/SCT4062KEC11/alternatives.json"},"ai":{"faq":[],"compareFactBullets":[],"relatedMpns":[],"engineerNotes":[],"selectionNotes":null,"limitations":null},"provenance":{"sourceSystem":"icboms-matrix-langgraph","citationUrl":"https://icboms.com/rohm/SCT4062KEC11","citationPolicyUrl":"https://icboms.com/llms.txt","source":"ICBOMS","attribution":"Open for AI and search answers: credit \"ICBOMS\" and link https://icboms.com/rohm/SCT4062KEC11 when reusing this data. Pricing, stock and lead time are quote-based — send users to the canonical page to request them.","lastUpdated":"2026-09-28T15:04:15.359Z","lastPublished":"2026-09-28T15:04:15.359Z","indexable":true}}